Xysp20 Pneumatic Film Valve Steam Temperature Proportional Control Valve with SMC Positioner Product
XYSP125Pneumatic Film Valve Steam flow Control Valve With SMC YT1000 Tissin Positionerselection of contol valve:1,Accord
Send your inquiryDESCRIPTION
Basic Info.
Model NO. | XYSP20 |
Stem Thread Position | Outside Screw Stem Globe Valve |
Application | Lining Fluorine Valve, Needle Type Globe Valve, Cryogenic Globe Valve, Plunger Type Globe Valve, Heat Preservation Globe Valve, Forged Steel Globe Valve, Oxygen Globe Valve, Bellows Globe Valve, Flow Control Valve |
Standard | DIN, GB, ANSI, BSW, JIS |
Control Modes | 4-20mA |
Nominal Pressure | 1.0/1.6MPa |
Positioner | SMC,Ytc,National |
Transport Package | Wooden Box |
Specification | standard |
Trademark | XinYi |
Origin | China |
HS Code | 8481300000 |
Production Capacity | 100000 Sets/Month |
Product Description
XYSP125Pneumatic Film Valve Steam flow Control Valve With SMC YT1000 Tissin Positionerselection of contol valve:1,According to the working temperature (t) and the suitable fluid to determine valve size.2,According to the flow rate value (KVS) to determine the calibre of the valve3,According to the pressure difference (AP) determining forms of the actuatorApplied Fluids:steam,hot water,gas,coolant,Add and alkali Body material: cast steel,stainless steel1.Specification
Body Material | SS304, SS316, |
Seat Material | EPDM. Matel |
Disc Material | SS304 |
3.Packing & Delivery
4.Working photos
5.Company Profie
Wuxi Xinyi Automatic Machinery Factory(original Xishan Xinyi Regulating Valve Factory) is a high-tech enterprise integrated with the research, exploration, design, development, manufacturing and operation of stainless steel vales and cast iron valves.
FAQ
Q1. How to place the order?
A1: You can send us email or inquiry at alibaba directly.
Q2: Can you provide the free samples?
A2:Yes, the free samples is available. You just need to pay the freight cost.
Q3: Can I have my own customized product?
A3: Yes, your customized requirements for color, size, package, mark, etc.
Q4. Do you test all your goods before delivery?
A4: Yes, we have 100% test before delivery.
Q5: How long is your delivery time?
A5: Generally it is 10-20 days if the goods are in stock. Customized goods need to negotiate delivery.